Civil · Geotechnical · InfrastructureSipil · Geoteknik · Infrastruktur

DoniSyahrizal

Civil engineer with expertise in subsurface analysis, foundation design, and infrastructure works. BNSP Level 7 certified. Field-ready across EPC, Mining, and Oil & Gas sectors. Insinyur Sipil dengan keahlian dalam analisis bawah permukaan, desain pondasi, dan pekerjaan infrastruktur. Tersertifikasi BNSP Level 7. Siap diterjunkan di sektor EPC, Pertambangan, dan Migas.

Doni Syahrizal

// Field Data// Data Lapangan

150+
CPT / SPT AnalyzedDataset CPT/SPT
560m
Road DesignedTrase Jalan
2.55B
IDR EstimatedEstimasi Biaya
L7
BNSP CertifiedSertifikasi BNSP
Geotechnical AnalysisAnalisis Geoteknik
Foundation DesignDesain Pondasi
Road EngineeringTeknik Jalan Raya
Hydrological AnalysisAnalisis Hidrologi
Site SupervisionPengawasan Lapangan

Built for
Field &
Analysis.
Ditempa di
Lapangan &
Analisis.

GeotechnicsPLAXIS 2DCivil 3DHEC-RASSNI 8460:2017EPCMiningOil & Gas

Civil Engineering graduate from Institut Teknologi Sumatera (ITERA) specializing in geotechnical engineering and infrastructure. Currently working as a Geotechnical Engineer at PT. Bintang Pondasi Borpile, analyzing subsurface data and delivering foundation recommendations across diverse project types.

My background spans geotechnical investigation, road engineering for mining operations, hydrological analysis, and site supervision — giving me both the analytical depth and field perspective to deliver reliable engineering decisions under pressure.

BNSP Level 7 certified as a Young Road Engineering Expert and holder of a HEC-RAS training certificate from Kementerian PU. Actively targeting opportunities in EPC, Mining, and Oil & Gas sectors.

Lulusan Teknik Sipil dari Institut Teknologi Sumatera (ITERA) dengan spesialisasi di bidang geoteknik dan infrastruktur. Saat ini bekerja sebagai Geotechnical Engineer di PT. Bintang Pondasi Borpile.

Latar belakang saya mencakup penyelidikan geoteknik, teknik jalan untuk operasi pertambangan, analisis hidrologi, dan pengawasan lapangan.

Tersertifikasi BNSP Level 7 sebagai Ahli Muda Teknik Jalan dan pemegang sertifikat pelatihan HEC-RAS dari Kementerian PU.

Tools &
Competencies
Perangkat &
Kompetensi

// Geotechnical & Analysis// Geoteknik & Analisis

PLAXIS 2DCPT/SPT AnalysisBearing CapacityFoundation DesignSoil ClassificationSNI 8460:2017ASTM Standards

// Structural & Hydraulic// Struktur & Hidrolika

SAP2000STAAD.ProMIDAS CivilHEC-RASHydrological AnalysisDrainage DesignSNI 1727:2020

// Design & Management// Desain & Manajemen

Civil 3DAutoCADArcGISREVITMS ProjectCost EstimationDrone Operations

Professional
Record.
Rekam Jejak
Profesional.

01

Aug 2025 — PresentAgu 2025 — Sekarang

Geotechnical Engineer

PT. Bintang Pondasi Borpile · Full TimePT. Bintang Pondasi Borpile · Penuh Waktu

+
  • Analyzed 150+ CPT/SPT datasets to develop safe and cost-efficient foundation recommendations in accordance with SNI 8460:2017 and ASTM standards.
  • Monitored foundation works ensuring constructability and compliance with SNI 1727:2020 load and project requirements.
  • Menganalisis 150+ dataset CPT/SPT untuk menyusun rekomendasi pondasi yang aman dan efisien sesuai standar SNI 8460:2017 dan ASTM.
  • Memantau pekerjaan pondasi untuk memastikan constructability dan kepatuhan terhadap SNI 1727:2020.
02

Apr 2025 — Jun 2025

Associate Road Engineer

PT. Nusa Karya Arindo · Fly Over Jetty Moronopo

+
  • Designed 560 m horizontal and vertical alignments using Civil 3D, supporting jetty and haul operations based on mining standards.
  • Optimized project through calculation of 195,710 m³ cut and fill volume for accurate earthwork estimation.
  • Mendesain alinyemen horizontal dan vertikal sepanjang 560 m menggunakan Civil 3D untuk operasi pengangkutan dan jetty tambang.
  • Menghitung 195.710 m³ volume cut and fill untuk estimasi pekerjaan tanah yang akurat.
03

Jul 2024 — Sep 2024

Site Supervisor

PT. Djuri Teknik · Internship · Preservation R.207PT. Djuri Teknik · Magang · Preservasi R.207

+
  • Supervised 6.2 km of road reconstruction and 2 km drainage channel construction, ensuring efficiency and quality control.
  • Verified work quantities alongside inspector across 3 major work segments.
  • Mengawasi rekonstruksi jalan 6,2 km dan saluran drainase 2 km, memastikan efisiensi dan kendali mutu.
  • Memverifikasi kuantitas pekerjaan bersama inspektur pada 3 segmen kerja utama.
04

Feb 2023 — Nov 2024

Hydrologist & Estimator

Teknik Sipil ITERA · Academic ProjectsTeknik Sipil ITERA · Proyek Akademik

+
  • Assessed rainfall and water availability for 1,389 ha of farmland across multiple villages.
  • Designed a 2,350 m drainage channel with a 10-year hydrologic and hydraulic analysis.
  • Prepared material-based cost estimation of IDR 2.55 billion for community drainage infrastructure.
  • Menilai curah hujan dan ketersediaan air untuk 1.389 ha lahan pertanian di beberapa desa.
  • Mendesain saluran drainase 2.350 m dengan analisis hidrologi periode ulang 10 tahun.
  • Menyusun RAB sebesar Rp 2,55 Miliar untuk infrastruktur drainase komunitas.

Highlighted
Projects.
Sorotan
Proyek.

// Filter// Filter
foto-borpile.jpg

// Project 01 · 2025// Proyek 01 · 2025

Foundation RecommendationsRekomendasi Pondasi

PT. Bintang Pondasi Borpile

Geotechnical analysis of 150+ CPT/SPT datasets. Evaluated soil stratification, bearing capacity, and settlement behavior using PLAXIS 2D to deliver bored/strauss pile recommendations.

Analisis geoteknik terhadap 150+ data Sondir/Boring menggunakan PLAXIS 2D untuk rekomendasi pondasi bored/strauss pile pada berbagai proyek.

foto-nusa-karya.jpg

// Project 02 · 2025// Proyek 02 · 2025

Fly Over Jetty MoronopoDesain Jalan Fly Over Jetty

PT. Nusa Karya Arindo

Designed 560 m geometric road alignment using Civil 3D. Calculated 195,710 m³ earthwork cut and fill volume for material balance and project efficiency.

Mendesain alinyemen geometrik jalan 560 m menggunakan Civil 3D. Menghitung 195.710 m³ volume cut and fill untuk efisiensi proyek.

foto-djuri.jpg

// Project 03 · 2024// Proyek 03 · 2024

Road Reconstruction — R.207Supervisi Rekonstruksi — R.207

PT. Djuri Teknik

Supervised 6.2 km road reconstruction and 2 km drainage channel. Quantity verification across 3 major segments, ensuring compliance with specs.

Mengawasi rekonstruksi jalan 6,2 km dan drainase 2 km. Verifikasi kuantitas pada 3 segmen kerja sesuai spesifikasi teknis.

foto-itera.jpg

// Project 04 · 2023–2024// Proyek 04 · 2023–2024

Drainage & Hydrological StudiesDrainase & Studi Hidrologi

ITERA Academic ProjectsProyek Akademik ITERA

Hydrological analysis for 1,389 ha. Designed 2,350 m drainage channel with 10-year flood analysis. IDR 2.55B cost estimation, 80+ community members engaged.

Analisis hidrologi 1.389 ha. Desain drainase 2.350 m analisis banjir 10 tahun. RAB Rp 2,55 Miliar, melibatkan 80+ warga.

Certifications
& Education.
Sertifikasi
& Pendidikan.

BNSP · Level 7

Young Road Engineering ExpertAhli Muda Teknik Jalan

Badan Nasional Sertifikasi Profesi

Issued July 2025Terbit Juli 2025 · No. 74321 2142.03 7 000326 2025

Upload
cert-bnsp.jpg
Kementerian PU

HEC-RAS Training CertificateSertifikat Pelatihan HEC-RAS

Kementerian Pekerjaan Umum

Issued January 2025Terbit Januari 2025 · No. 08/HATHI-LAMPUNG/I/2025

Upload
cert-hecras.jpg
ITERA · 2025

Bachelor of Engineering — CivilSarjana Teknik Sipil (S.T.)

Institut Teknologi Sumatera

Graduated July 2025Lulus Juli 2025 · IPK 3.20 / 4.00

Upload
ijazah.jpg
National · 2022

Top 10 Finalist — LKTIKN 2022Top 10 Finalis — LKTIKN 2022

HMS Bulldozer · Universitas Negeri Gorontalo

National Student Innovation CompetitionLomba Karya Tulis Ilmiah Nasional

Upload
cert-lktikn.jpg

Let's
Work
Together.
Mari
Ber-
kolaborasi.

Open to full-time opportunities in EPC, Mining, and Oil & Gas. Available for project consultations and professional collaboration.Terbuka untuk peluang penuh waktu di sektor EPC, Pertambangan, dan Migas.